Warning: Private methods cannot be final as they are never overridden by other classes in /home/public/wp-content/plugins/sf-move-login/inc/classes/class-sfml-singleton.php on line 64

Warning: Private methods cannot be final as they are never overridden by other classes in /home/public/wp-content/plugins/sf-move-login/inc/classes/class-sfml-singleton.php on line 72

Warning: The magic method SFML_Singleton::__wakeup() must have public visibility in /home/public/wp-content/plugins/sf-move-login/inc/classes/class-sfml-singleton.php on line 72

Deprecated: Required parameter $current_comment follows optional parameter $custom_options in /home/public/wp-content/themes/suffusion/functions/filters.php on line 48

Deprecated: Required parameter $current_post follows optional parameter $custom_options in /home/public/wp-content/themes/suffusion/functions/filters.php on line 48
Troubleshooting At The Museum – Effective Concepts LLC
Deprecated: Required parameter $args follows optional parameter $depth in /home/public/wp-content/themes/suffusion/library/suffusion-walkers.php on line 27

Deprecated: Required parameter $output follows optional parameter $depth in /home/public/wp-content/themes/suffusion/library/suffusion-walkers.php on line 27
Jan 052014
 

In the new issue of Engineered Systems, Doug Lucht, writes up his experiences troubleshooting an Air Handling Unit at an art museum. He describes the steps he took to locate the problems in an air handling system that never worked properly. The facility had to turn on the chillers as early as March with sub 45-degree temperatures, when the economizers should have been taking care of the building. I love a good mystery and it points out- facilities should not just except poor performance of their equipment but should get to the bottom of it. Solutions were found, Lucht writes…

Once the booster fan was installed, AHU-9 could fully economize. The museum could now keep their chillers off further into the spring and shut them down earlier each fall. They were also able to completely abandon the roof-mounted chiller that served the chilled water fan coil units. Shortly after implementing the solutions, the museum received a check from their utility provider, which made the facility manager look like a hero to the museum curators.

This story also illustrates why cobbling together new and old equipment isn’t always the best way to save money. It demonstrates there are small upgrades that can make big changes to the facility’s comfort and bottom line.

VBA-18 to 190 Ventasen Booster Fan

Ventasen Booster Fan
Product# VBA-18 to 190.
Airflow:144-1900CMH